BEC Industrial provides turnkey warehouse relocation and liquidation services — managing every aspect from planning and dismantling to transportation, reinstallation, and asset recovery. Whether you’re moving a single facility or consolidating multiple sites, we deliver safe, efficient transitions designed to minimize downtime and maximize return on assets.
​
Our experienced team coordinates logistics, engineering, and installation across the U.S., ensuring your material handling systems, equipment, and infrastructure are relocated or liquidated to ensure you get the most value out of your existing assets.

Warehouse Relocation & Liquidation Services
Smart Transitions. Maximum Value. Minimal Downtime.
Why Choose BEC Industrial for Warehouse Relocation & Liquidation
Comprehensive Project Management
From initial planning to final commissioning, BEC Industrial handles every stage of your relocation — including inventory mapping, asset disassembly, and reinstallation.
Safety & Compliance First
All work adheres to OSHA, ANSI, and local code requirements. Our crews follow strict safety protocols during dismantling, rigging, and transport.
Asset Recovery Expertise
We evaluate surplus equipment and materials for resale, reuse, or recycling, helping you maximize value from decommissioned assets.
Nationwide Coordination
With a nationwide network of installers, riggers, and logistics partners, we manage relocations across multiple states while maintaining consistent safety and quality standards.
Minimized Downtime
Our methodical approach allows for phased transitions, keeping key operations online while we move, reconfigure, or liquidate the rest.
End-to-End Accountability
As a single-source partner, BEC Industrial provides one point of contact from site audit to project completion — no handoffs, no confusion, no delays.

Core Services
1. Facility & System Relocation
-
Complete relocation of pallet racking, mezzanines, conveyors, automation equipment, and material handling systems.
-
Detailed pre-move audits and labeling for accurate reinstallation.
-
Integration with new site layouts and engineering requirements.
2. Warehouse Liquidation
-
Asset appraisal, inventory documentation, and recovery planning.
-
Dismantling and sale of racking, shelving, conveyors, packaging equipment, and machinery.
-
Responsible recycling or disposal of unsellable materials.
3. Decommissioning & Site Restoration
-
Removal of anchors, wiring, and obstructions to restore lease conditions.
-
Floor patching, sealing, and compliance with facility handover requirements.
4. Transportation & Logistics
-
Coordinated freight management for materials, equipment, and components to new destinations.
-
Use of insured and experienced rigging and hauling teams.
5. Reinstallation & Commissioning
-
Rebuild and install equipment at your new facility with full compliance to engineering and safety standards.
-
Final inspection and verification of system integrity and functionality.
Our Relocation & Liquidation Process
Phase 1: Site Audit & Planning
-
On-site assessment of existing systems, facility layout, and operational constraints.
-
Develop detailed move plans, schedules, and safety protocols.
Phase 2: Equipment Tagging & Documentation
-
Each system component is tagged, cataloged, and photographed to ensure accurate reassembly and accountability.
Phase 3: Disassembly & Packaging
-
Controlled dismantling with proper equipment labeling, hardware organization, and protection for transport.
Phase 4: Transportation & Storage
-
Safe loading, transport, and staging of all materials at new or interim locations.
Phase 5: Reinstallation & Verification
-
Rebuild all racking, conveyors, mezzanines, and equipment per engineered layout.
-
Perform final inspections and provide load certifications if applicable.
Phase 6: Asset Liquidation (Optional)
-
Identify surplus assets for resale or recycling to recover maximum value.
-
Provide detailed documentation for accounting and reporting purposes.

Safety, Compliance & Quality Assurance
-
All dismantling and installation performed under OSHA and ANSI standards.
-
Full PPE enforcement and site-specific safety training for all personnel.
-
Anchoring, bracing, and lifting handled by qualified riggers and certified installers.
-
Engineering review and stamped drawings available for structural relocations.
-
Daily safety meetings and progress reporting to maintain accountability.
Industries We Serve
-
Warehousing & Distribution
-
3PL & Logistics Providers
-
Manufacturing & Assembly Facilities
-
Food & Beverage Processing
-
Retail & E-Commerce Fulfillment
-
Pharmaceutical & Healthcare
-
Construction Supply & Building Materials
Frequently Asked Questions
How long does a typical warehouse relocation take?
Timeframes vary based on facility size, equipment complexity, and scope. Smaller projects can be completed in days, while full-scale relocations may require several weeks.
Do you handle permits and engineering for reinstallation?
Yes. BEC Industrial provides engineered drawings, load calculations, and stamped documentation for any reinstallation requiring local permitting.
Can you buy or liquidate our used racking and equipment?
Absolutely. We can appraise, purchase, or resell used material handling equipment through our network of buyers and recyclers.
What if my new facility layout is different?
Our design team will adapt your system to fit the new space, adjusting beam lengths, upright heights, and layouts as needed.
Do you provide insurance and safety certifications?
Yes. We carry full liability, workers’ compensation, and auto coverage, and all crews are safety-certified for rigging, forklift operation, and aerial lifts.
Sample Project Scenario
Client Challenge
A national 3PL provider needed to vacate a 250,000 sq. ft. warehouse within 60 days while relocating key equipment to a new facility.
​
Our Solution:
-
Conducted a detailed audit and developed a phased relocation plan to maintain operations during transition.
-
Dismantled and relocated pallet rack, conveyors, and dock equipment while liquidating surplus materials.
-
Coordinated freight, reinstallation, and final site restoration for lease compliance.
​
Outcome:
-
Project completed ahead of the 60-day schedule.
-
Zero safety incidents during disassembly or transport.
-
Recovered significant value from surplus racking and equipment.